Thursday, May 26, 2016

DETAILING AND WORK DRAWINGS SEMESTER 3: INDIVIDUAL REFLECTION

We were required to prepare a measured drawing report based on a site given to us, which is the 3K Sports Complex in Subang Jaya. Forming a group of 4, we were required to produce a report and drawings of the site based on what we have obeserved and measured there.

For the project, I am tasked with doing the report. The workload of the task is divided between me and Dickson. I did some parts of the report, including introduction, local climates, vegetation, man-made features, sensory, structural wall type, opening, interior materials, air conditioning, and building transportation systems.

I also helped out with the drawing by double-checking on any errors that we might have made, and also keeping the whole team on track with the work and deadline.

No comments:

Post a Comment