In this project, we were required to produce a design for a collapsible kiosk that was meant to promote the curative retreat centre that we design in the final project. The project is done working in the the same group of 4 as the first project.
We design the kiosk along with a brand for our curative retreat centre, and some corporate identity systems with it as well. The requirements for the kiosk is that it has to be collapsible as it is a temporary kiosk. So we had to design it in a way that it was easy to set up and easy to disassemble.
I worked on producing the powerpoint slide and the presentation board for the project. I also helped in the development of idea and design of the kiosk design as well as the collapsible methods.
Link to padlet: https://padlet.com/jonlamkinweng/fw8k550ii5vu
Link to PPT Slide: https://www.dropbox.com/s/ozehnjnfffe3zyl/NEURELIEF%20PPP.pptx?dl=0
Friday, December 30, 2016
INTERIOR DESION PROJECTS 3: PROJECT 3: CURATIVE RETREAT CENTRE
This project is about design a curative retreat centre based on the projects that were done previously. For this project I have to design a meditation and spa centre for working adults that are stressed. The design for this project was based on style of modern luxury.
![]() |
| First submission of presentation board |
![]() |
| Second submission of presentation board |
![]() |
| Additional A1 board |
INTERIOR DESION PROJECTS 3: PROJECT 2B: SITE ANALYSIS
In this project we were taken to the site of our potential curative retreat centre. We were required to make observations and take measurements of the site to bring back and produce a presentation slide of the Strength, Weaknesses, Opportunities and Threats, as well as the technical drawings.
For this project I produced the plan drawings for the first floor and ground floor of the site.
Link: https://www.dropbox.com/s/v2zxr5qdzbtcdz3/building_analysisslide.pdf?dl=0
For this project I produced the plan drawings for the first floor and ground floor of the site.
Link: https://www.dropbox.com/s/v2zxr5qdzbtcdz3/building_analysisslide.pdf?dl=0
INTERIOR DESION PROJECTS 3: PROJECT 1: RESEARCH AND FINDINGS
This project is the basis that would lead to our final project of the semester that is to design a curative retreat centre. In this project we were grouped into a group of 4 people and were required to research on a given topic and present it in video medium.
The topic given to us was cerebral. For this topic, we had to research on the meaning of the word, along with the issues and the services that a curative retreat would provide for the issue.
For this project, I was tasked with the preparation of the video that was given. I compiled and edited the images and videos that were taken from the Internet and placed information into one cohesive video.
Link to video: https://www.youtube.com/watch?v=RmotTeTrpUg
The topic given to us was cerebral. For this topic, we had to research on the meaning of the word, along with the issues and the services that a curative retreat would provide for the issue.
For this project, I was tasked with the preparation of the video that was given. I compiled and edited the images and videos that were taken from the Internet and placed information into one cohesive video.
Link to video: https://www.youtube.com/watch?v=RmotTeTrpUg
Saturday, December 17, 2016
VIDEO EDITING AND PRODUCTION SEMESTER 4: FINAL PROJECT SHOOTING AND VIDEO
For the final project in the course, we were required to work in a group of 3 to produce a video based on a storyboard one of the members have written. For the video, it was based on my storyboard about depression.
The role that was assigned to me was the director of the video. I was tasked with ensuring the scenes go according to the storyboard as well as directing the actors and the scenes as well as the set up. Overall, I was tasked with leading the group in performing the video shooting.
Among the few challenges that were faced while producing this video is the space constraints of the setting, being in a small room. Another challenge faced was the lighting when shooting outdoors in the corridor scene.
Link to the video: https://youtu.be/hOd-UdtTrTg
The role that was assigned to me was the director of the video. I was tasked with ensuring the scenes go according to the storyboard as well as directing the actors and the scenes as well as the set up. Overall, I was tasked with leading the group in performing the video shooting.
Among the few challenges that were faced while producing this video is the space constraints of the setting, being in a small room. Another challenge faced was the lighting when shooting outdoors in the corridor scene.
Link to the video: https://youtu.be/hOd-UdtTrTg
Thursday, December 1, 2016
VIDEO EDITING AND PRODUCTION SEMESTER 4: PROJECT 1 STORYBOARD
Link to the storyboard prepared for the Video Editing and Production final project.
https://drive.google.com/open?id=0B6zppKfoA96sNjJTcDNJTjlnaFU
https://drive.google.com/open?id=0B6zppKfoA96sNjJTcDNJTjlnaFU
Subscribe to:
Posts (Atom)









